BigPicture 8.23.0 Release Notes
Category | Feature description | Sneak peek |
---|---|---|
Usability | Home (root box) dates cannot be changed on the timeline The home (root) box dates are based on the dates of boxes in the hierarchy and cannot be changed. A tooltip with an explanation has been added. It is not possible to attempt to move the box. |
|
Task scheduling warnings added to the Calendar module Warning message containing an explanation appears when task dates cannot be changed. |
| |
Workload | Task workload distribution is the same when task is in multiple boxes Old calculation: Workload is distributed based on capacity. Capacity depends on resource and team allocation, which can vary across boxes. This could result in the workload distribution of a task being different across the boxes. The change: Workload distribution is the same across boxes.
OLD CALCULATION Task in two boxes Acorn Box - task assigned to a person (Nola Ross) - task assigned to a team (Acorn team) - task assignee (Nola Ross) is a member of the Acorn team (50% allocation) → 4h of assignee capacity is dedicated to the team’s work. - Workload distribution is front-loaded. - BigPicture allocates max of 4h a day to a task (based on the assignee membership in a team)
Zebra box - tasks details are the same in both boxes (assignee is Nola Ross, task assigned to the Acorn team) - task Original estimate is the same in both boxes (10h) - workload mode (front-loaded) is the same in both boxes - The Acorn team is NOT in a Zebra box. Acorn team memberships, including allocation details, don’t affect the workload calculation in the Zebra box. - Workload is distributed based on total assignee capacity (8h a day).
|
|