BigPicture 8.44.0
Release date: Dec 16, 2024
Our team is thrilled to announce the latest release of BigPicture, version 8.44.0.
Contents |
---|
|
New
New Resources module
The new view of the Resources module is the default. It is possible to switch to the old view.
Swimlanes
The new view lets you organize data into the following swimlanes:
Individuals
Teams
Projects new
Skills New
Grouping
The new grouping mechanism allows for a two-level grouping of tasks and provides better insight into your portfolio. Now, you can easily track things like capacity and workload across projects and teams.
Thanks to grouping, you can get high-level insights into your projects on a portfolio level (see a few examples):
Example: Based on assigned tasks, what is the workload assigned to each person in a project.
Backlog panel
Backlog panel has been redesigned. The new panel helps you find all the unscheduled tasks present in your box.
Use the panel filters to find tasks without
dates
assignee
team
Yearly timeline view
The yearly resources timeline view is available to help you plan and analyze your team's tasks, capacity, and workload for the long term.
You can set your timeline's time period to one year.
Move to a different spot on the timeline by selecting a date (beginning of the grid)
Two new aggregation options have been introduced:
quarterly
yearly
Workload, capacity, and utilization - tile coloring
The tile colors indicate whether resources are over-allocated or under-allocated. The new view in the Resources module introduces updated coloring rules, where each tile color corresponds to a specific level of resource utilization.
new Now, you can customize the coloring rules to better fit your needs. Settings are adjusted per box type.
If you haven’t created custom coloring settings, the default coloring rules in the new Resources module are as follows:
For individuals, projects, and skills swimlanes:
green - utilization under 100%
red - utilization is above 100%
Note: yellow is NOT used to indicate approaching over-allocation.
Example: if a person has been assigned 7.8h of workload and their capacity is 8h, the grid cell is green
For the teams swimlane:
green - 0% to 80% utilization
yellow - 80 to 101% utilization
red - 101% or higher utilization
Example:
Usability improvements
Snipe to a search result task
Task dates visible during resizing
Tooltips added
Grid cells show units (hours, man-days, percentage, story points)
Jump to the nearest task in a swimlane
Custom task colors are available - right click on a task to access the color menu
Filters
Filter by panel introduced
gantt module scope module resources module
Filter by functionality is available in the following modules:
Gantt
Scope
Resources (new view)
It lets you filter tasks by built-in fields without the need to use JQL:
filtering covers all task types: Jira issues, Basic tasks, Sprints, Versions, etc
filtering is based on most of the available built-in fields in BigPicture (regardless of what is in the column):
Actual Cost
Assignee
Baseline End date
Baseline Start date
Duration Calendar Days
Duration Working Days
End date, Estimated Cost
Milestone
Original Estimate
Progress
Remaining Estimate
Risk consequence
Risk probability
Scheduling mode
Start date
Status
Story points
Team
Time spent
When checkboxes are used, the “OR” logic applies.
For example, based on the selection in the image below, you will see both the ‘in progress’ and the ‘to do’ tasks.
Questions and feedback
Explore exciting features, pricing updates, reviews, and more on the Marketplace.
Stuck with something? Raise a ticket with our support team.
Do you love using our app? Let us know what you think here.
Credits
A heartfelt thank you to our valued customers! Your incredible support and feedback inspire us to improve our apps and products continually. You are the driving force behind why we create software. We appreciate your trust in BigPicture!