BigGantt 8.19.0 Release notes
Category | Feature description | Sneak peek |
---|---|---|
Scheduling | Dates do not need to be specified when a new task is added to a box (either by creation or modification of scope definition). Tasks without dates are visible in the task tree (WBS) but aren’t shown on the Gantt chart until the start/end date is specified. Additionally, unscheduled tasks are visible in a panel on the Resouces module. Note: Existing tasks that have already been positioned on the timeline are NOT affected by the change. The Overdue feature is NOT available for tasks that don’t have a start/end date. |
|
Task dates (start/end) based on estimates - behavior Change of a task duration or the estimate value results in a task being resized. The mapped value (either start or end) is updated. The other date doesn’t change (unless additional scheduling mechanisms apply) Change of the start/end date value (behavior the same regardless of which value is mapped):
| n/a | |
BigTemplate | Tasks without dates can be exported All tasks are exported:
| n/a |
Tasks without dates can be imported All tasks are imported:
Note: validation check → start date cannot be later than end date | n/a | |
Usability | After page refresh, the Gantt chart view returns to the same position on the timeline | n/a |