Sync rules.

Meet the new BigPicture navigation

A faster, smarter, and more intuitive way to work is here. We’ve redesigned BigPicture navigation to give you a smoother experience and better access to what matters most.

→ Discover what’s new, explore key improvements, and review feature name updates on the New navigation page.

→ The rollout will happen gradually, and the previous navigation will be retired in September 2026.

Sync rules.

This content is archived.
image-20240506-092529.png

Partial sync

Synchronization time interval

Specify the time interval (in seconds) for the App to synchronize data with connected instances. The minimum value is 1 second, and the maximum is 10 seconds.

Updates processing control

Composition - Tabs

Additional box sync

Scheduled synchronization

Jira does not always notify the BigPicture App about changes (for example, no updates are triggered when a project is removed) - the scheduled synchronization mechanism assures that the scope of your work is always up to date. 

Task limit

Maximum number of tasks in a box

Set the maximum number of tasks that a single Box can hold to limit BigPicture's performance impact on your Jira instance. The default value is 100,000 tasks, and there is no maximum limit.

For more information, see our BigPicture Sizing Guide.

The performance can also be improved by increasing the synchronization time interval.

Task grouping limit

Set a limit on how many tasks a box will perform grouping for. The maximum number is set to 50000 tasks.

 

Need support? Create a request with our support team.

Copyright © 2005 - 2026 Appfire | All rights reserved.