Story Points Mode
Introduction
The capacity and remaining capacity of your entire team or individual team members expressed in time units can be converted into story points.
Configuration
To set the conversion rate go to Box configuration > Resources > Story points (Box admin security role required).
The story point conversion ratio tab in the Box configuration might not be visible if conversion is disabled in the Box type.
Story point conversion
When you enable this mode, the capacities are converted from time units to story points. The story point estimation is evenly distributed over the duration period.
Warnings
You can enable Warnings to help you with identifying tasks without the story point estimate. If the task has no story points, the warning will be triggered.