No task assignment
When a resource is not assigned to any tasks, no workload will be displayed.
Task assignment exists
Standard
Out of the Box, when the workload is:
Less than 75% of the capacity the bar will change Green color (under-allocation)
Between 75% and 100% of the capacity, the bar will change to an Orange color (moderate allocation)
Over 100% of the bar will change to Red color (overallocation)
Custom
BigPicture Enterprise feature → coloring rules can be defined only when using the BigPicture Enterprise add-on.
Levels and colors of the grid in the Resources module depend on Box type settings (Administration> Box type configuration > Resources > Coloring rules) and can't be adjusted for an individual Box.