Set up a source space and linked target space

Overview

Once you have installed the Comala Publishing app you use Publishing to sync two spaces in your instance: one as a draft space and the other as the published space.

  • the draft space is for all content additions and editing and is your space publishing source space

  • the published space shows the published content and is the space publishing target space

Content in the source space is published to the target space.

Linking the spaces

In your current space, the space administrator can choose to

Publish content from the current space to another space

This links the current space as a draft space (source space) to the published space (the target space) to which the draft content is published.

Publish content from another space to the current space

This links the current space as a published space (the target space) to the draft space (the source space) from which the draft content is published.

If you have existing public space in your instance and want to retain this for public viewing, you can initially use the Comala Publishing Copy Space option to copy this space content to a new space. The new space can then be configured as the source space to publish and sync content to the original space as the target space.

Set up a source space and target space

  1. Choose Publishing in Space tools



  2. Choose one of the Publish options

  3. Choose Publish to another space

    • the pages of this current space are then set as pages in the draft source space and are published to another space (the target published space)

    • if you choose Publish from another Space the dropdown menu selection sets the source space - the space from which content is published to the current space (set as the target space)

  4. Choose Next

     

  5. Use the dropdown menu to select a Published Space

    If you have chosen to Publish from another space to the current space, then the chosen space is the Draft space.

  6. Choose Link

     

  7. Click Finish to return to the Publishing dashboard in Space tools



The draft and published spaces are now linked but you must perform an initial synchronization

  • choose Configure to select the publishing options

  • select Publish to synchronize the two spaces

When first publishing a draft space configure publishing to delete content added in the published space to

  • remove the published space home page

  • replace the deleted published space home page with a copy of the draft space home page

  • set this published page as the published space home page

If you don't want to publish the source space home page you can configure the source space Publish settings to ignore the top-level pages in this source space when publishing. This setting also means that any orphan pages that exist in the source space are not be published.