Sprint Roll-Up Report

Sprint Roll-Up Report displays the progress of all the sprints across projects. The summarised view shows the sprint details such as sprint timeline, status, and progress metrics % of Issues Complete, % of Story Points Complete, total Story Points, Story Points Completed, and Story Points Remaining. To expand and collapse the report view, click >. The expanded view displays the report for all sprints at the issue level with details.

The Sprint Roll-Up Report can further be tailored and detailed as required by selecting the fields from the Configuration fields.

  • Common Configuration fields - Make your selections for the report details from the fields such as Columns, Projects, and Include Sub Tasks. To learn more about these configuration fields, refer Roll-Up Reports for Jira Interface.

  • Sprints - Sprints displays the status options Active, Closed, and Future to filter the report result based on Sprints status.

For the report result generated from Actions, you can click to Save Selections for the report type and click to Export to excel. To refresh the report for selections, click Refresh results.

Sprint Roll-Up Report

 

References

To know the details of other report types, refer to the following pages.

Log a request with our support team.

Confluence®, Jira®, Atlassian Bamboo®, Bitbucket®, Fisheye®, and Atlassian Crucible® are registered trademarks of Atlassian®
Copyright © 2005 - 2024 Appfire | All rights reserved. Appfire™, the 'Apps for makers™' slogan and Bob Swift Atlassian Apps™ are all trademarks of Appfire Technologies, LLC.