Skip to end of banner
Go to start of banner

Setting up story points tracking

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

In Swanly you can track story points progress f your Scope on the burndown chart or as a percentage of the story points in a certain status category in the Issue or Release report.

[Picture of burndown chart and story points pie chart | alt: Jira story points burndown chart and reports in Swanly]

How to set up Story points tracking

[Picture of the Settings panel and the Map Story points field| alt: Setting up Jira story points tracking in Swanly]

  1. Go to Swanly via Apps > Swanly roadmaps

  2. Click on the Configuration > Settings in the top right corner of the screen

  3. In Map Story points field dropdown of the Settings panel select field that you would like to use for tracking (eg. Story points or Story points estimate)

The Story point field is now connected to Swanly and you’ll see the progress shown in the reports.

Setting up different Story points fields for Issue and Release reports

You can set different fields for Release and Issue in case the roadmaps and reports are used by different teams with different needs.

  • No labels