In Swanly you can track story points progress f your Scope on the burndown chart or as a percentage of the story points in a certain status category in the Issue or Release report.
[Picture of burndown chart and story points pie chart | alt: Jira story points burndown chart and reports in Swanly]
How to set up Story points tracking
[Picture of the Settings panel and the Map Story points field| alt: Setting up Jira story points tracking in Swanly]
Go to Swanly via Apps > Swanly roadmaps
Click on the Configuration > Settings in the top right corner of the screen
In Map Story points field dropdown of the Settings panel select field that you would like to use for tracking (eg. Story points or Story points estimate)
The Story point field is now connected to Swanly and you’ll see the progress shown in the reports.
Setting up different Story points fields for Issue and Release reports
You can set different fields for Release and Issue in case the roadmaps and reports are used by different teams with different needs.