Skip to end of banner
Go to start of banner

Sprint Roll-Up Report

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

Sprint Roll-Up Report displays the progress of all the sprints across projects. The summarised view shows the sprint details such as sprint timeline and progress metrics % of issues completed, % of story points completed, total story points, remaining story points, and story points completed. To expand and collapse the report view, click >. The expanded view displays the report for all sprints at the issue level with details.

The Sprint Roll-Up report can further be tailored and detailed as required by selecting the fields from the Configuration fields. The configuration fields display the below options.

  • Columns - Columns drop-down displays the list of Jira fields such as Text fields, Date fields, and Numeric fields (Roll-Up). You can select the fields to add to the Roll-Up report. The fields with a symbol displays help text on mouseover. To remove a field from the report result, deselect the field from the Columns drop-down.

  • Projects - Projects drop-down lists all the projects. By default, the Roll-Up report displays the result from all the projects. You can select projects to view report for specific projects.

  • Sprints - Sprints displays the status options Active, Closed, and Future to filter the report result based on status.

  • Include Sub Tasks - To include the subtask for all sprints in the report result, select Include Sub Tasks.

For the report result generated from Actions, you can click 💾 to Save Selections for the report type and click ⬇ to Export to excel. To refresh the report for selections, click 🔁 Refresh results.

Sprint Roll-Up Summary Report

  • No labels