Skip to end of banner
Go to start of banner

Change History

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Introduction

The change history tab contains displays the history of scheduling changes for that task. Changes that affect the start date, end date, and duration of the task are logged. It does not matter whether the change was made in BigPicture or in Monday.com/Trello. 

Previous states are listed in the tab.

Task details view

You can also open the panel directly from the task details view.

  1. Click on a task on the Gantt timeline

  2. Click "See changes

Recorded information

  • the date the change occurred

  • the reason for the change

  • the author of the change 

Item

Description

Expand arrow

In the expanded state you can see the archival data of the task

Change reason

The following changes are recorded:

  • New start/end date was set

  • Task was moved

  • Task was converted to a milestone

  • Task structure was changed

  • Dependency was added

  • Scheduling mode was changed

Change Author

Date of change

When the modification took place

Number of changes

When you move a parent task, all its children are also moved. All changes are logged:

Changes affecting other Boxes - a task can be in multiple Boxes. When you move a task, it is moved in all Boxes it is in. The change log reflects that.

Filters

Narrow down the list using the search function or the date range filter.

Only a simple text search is available.

The following fields are checked:

  • summary

  • description

  • issue key

  • comments

 The search results include:

  • changes made directly to a task

  • changes that are a result of modifications of other tasks (such as a move of a parent in the structure)

    Results that don't match the search are hidden. 

Date range 

Narrow down the list based on when a change took place: 

Snipe to task

The "snipe to task" button takes you to a task and selects it. 

Refresh Button

Use the refresh button to reload the info in the tab.

Any new changes are marked as 'new'.

Export

To unlock the export feature, install BigTemplate from the Atlassian Marketplace.

With BigTemplate installed, you can export change history from the last 30 days to an xlsx file.

The exported file includes all operations that impacted tasks from a box. If you use filtering options, the file also reflects that.

Constraints

Scenario mode

Changes made in scenario mode are not logged until a scenario is merged into the live version.

Log

The change log contains data from the last 30 days.

Number of listed changes

Change log displays up to 80 positions

To find a change that isn't visible, use the search function.

Number of change items (within a change)

Change log displays up to 30 task details associated with a given change.

Use the search function to narrow down the results and see information on a given task.

  • No labels