The TFS4JIRA Synchronizer is able to synchronize TFS / Azure DevOps (formerly VSTS) "Tree path" fields (i.e. "area paths" and "iteration paths") using specialized synchronization methods.
Three modes of synchronization are available, as shown in screenshot below:
- Copy full TFS tree path copies the whole path from TFS / Azure DevOps (formerly VSTS) field to Jira field. Jira field should be of "Text" type
- Copy last part of TFS tree path copies just the last part of the path (after the last
"\"
character). This can be used to automatically synchronize TFS / Azure DevOps (formerly VSTS) sprints to Jira versions, provided that Jira version names are the same as TFS sprint names - Map values can be used for versatile mapping of TFS / Azure DevOps (formerly VSTS) tree paths to any of the Jira "mappable" type. This will typically be used to map TFS / Azure DevOps (formerly VSTS) iteration path to Jira sprints and TFS / Azure DevOps (formerly VSTS) are apaths to Jira components, but it can also be used to map TFS / Azure DevOps (formerly VSTS) sprints to Jira versions or to any other "mappable" field. In case of mapping of sprints, TFS / Azure DevOps (formerly VSTS) workitems with no iteration path will be synchronized to Jira issues not assigned to any sprint.