There are two possible field options:

  • native external tool fields - they display the value from an external platform; if the value is unavailable, it is left empty (if a column is supposed to display Jira “Start Date,” nothing can be displayed for a Trello task - the task doesn’t exist in Jira, so the App can’t find a value for it)

  • Builtbuilt-in fields.

Built-in fields are capable of taking can take information from various external platforms and mapping them map it to a built-in field, effectively letting you see a single column showing values for multiple types of tasks coming from a multitude of external platforms and from native BigPicture elements.

...

You can check these fields by navigating to Jira to Jira administration (cog icon) > Issues > Custome fields and search searching by SoftwarePlant or BigPicture. 

...

The table below provides you with an overview of how built-in fields function in the App.

Task Attribute

Mapped to External Platform
(non-configurable)

Mapped to External Platform
(configurable)

Available for Basic Tasks
(tasks that exist only in the App)

Comment

Icon

YES

NO

YES

If an icon is not available on the external platform, the default icon will be used (same as for Basic Tasks)

Key

YES

NO

YES

The built-in “Key” column will aggregate issue/task/card keys from different platforms and display them in a single column. A “Key” field cannot be modified to display any different value.

Expand
Image Modified


Summary

YES

NO

YES

A built-in summary field cannot be removed. The mapping of the field can’t be changed.

Expand
Image Modified


Start date

YES

YES

YES

The mapping of the start date (built-in) field for Jira can be changed in the App Configuration.

Trello cards don’t have a start date. A built-in field uses the due date value (effectively, built-in field start and end dates of Trello cards are both mapped to Trello due date).

Basic Task dates are displayed in a built-in Start date column.

Expand
Image Modified


End date

YES

YES

YES


Baseline start date

YES

YES

YES


Baseline end date

YES

YES

YES


Progress

YES

YES

YES


Milestone

YES

YES

YES

Native App field. It exists only as a built-in field, but its value can be mapped to display a Jira value.

Expand
Image ModifiedImage Modified



Period mode

YES

YES

YES


Color

NO

NO

YES

Native App field. It can’t be mapped to display values from external tools.

Task ID

NO

NO

YES

Native App field. It can’t be mapped to display values from external tools.

Image Modified

Assignee

YES

NO

NO


Skills

NO

NO

YES

Native App field. It can’t be mapped to display values from external tools.

Status

YES

NO

NO


Duration Calendar Days

NO

NO

YES

Based on the number of calendar days (start to end date).

Image Removed
Image Added
  • counts all days between the start/end date (including weekends, holidays etc.)

  • inline editing (NO)

Duration working days

NO

NO

YES

Based on the number of working days (non-working days excluded).
Image Modified

  • counts days between the start/end date → excludes weekends, holidays, absences of an assignee etc.

  • inline editing (YES)

Outline level

NO

NO

YES

Dynamically built Data Type - the values aren't permanently associated with tasks; the field value adjusts to reflect WBS changes.

Display Options:

  • indent level

  • Sequential index

Image Removed
Image Added

Outline level → shows how deep the task is in the tree structure (WBS). 
Image Modified

Sequential Index → shows where the task is located in the WBS structure (similar to the notation of the table of contents in the book)

Image Removed
Image Added

Note: filtering does not affect the Sequential Index. 

Overdue Start/End Date

NO

NO

NO 

Image Removed
Image Added

The Overdue Start Date field calculates the difference between the current task Start Date (when status category is To Do). 

  • Data type: number

  • Only calculates full calendar days

  • If the difference is larger than 0, the difference as a number of days is displayed as an integer

  • If the difference is 0 or smaller, the field is blank

  • If the status category is In Progress or Done, the field is blank

  • No inline editing

  • Aggregations: default Number data Type aggregations


The Overdue End Date calculates the difference between the current task End Date (when status category is not Done).

  • Data type: number

  • Only calculates full calendar days

  • If the difference is larger than 0, the difference as a number of days is displayed as an integer

  • If the difference is 0 or smaller, the field is blank

  • If the status category is Done, the field is blank

  • No inline editing

  • Aggregations: default Number data Type aggregations

Image Modified

Team

NO

NO

YES

The Team field is based on the Team data type. Team created in BigPicture is visible in a column view on Gantt and Scope modules and is inline edited. 

The field can also be used even not synchronized. Check App Configuration > General > Fields > General mapping.

Image Modified

Workload Contouring Mode

NO

NO

YES

The Workload contouring allows to spread the effort of the task over its duration. There are three automatic options and one manual mode to choose from. 

  • Flat

  • Front-loaded

  • Back-loaded

  • Manual (only for BigPicture Enterprise)

Image Modified

Basic Tasks

A built-in field lets you easily visualize all data related to Basic tasks native to the BigPicture App itself. Some values, such as Assignee, are not available (because this attribute doesn’t exist for them), but all existing attributes of Basic Tasks can be displayed using built-in fields. 

...