Skip to end of banner
Go to start of banner

Reports

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Current »

Introduction

The Objectives module (formerly "Roadmap") includes status-based reports of your objectives. Using bar or pie charts, you can show the actual progress for each Box and team.

The reports can be generated at two levels, the upper level and the lower level, and provide two separate sets of charts. For example, in the case of a SAFe ART, the upper level would be the Program Increment, and the lower one would be the Iteration level.

Objectives assigned to sub-Boxes do not roll up to the upper-level Box.

Chart types

There are two chart types available:

Bar charts

Hover over a bar to display the number of objectives in each column. 

Pie charts

 Hover over the charts to display the exact distribution of the objective statuses. You can also click on the legend to exclude categories.





  • No labels