When designing a new report, a customer might be required to use a column format that’s not part of the built-in/available options for the Resolved field. In this case, configuring a Calculated field can be a solution.
\uD83D\uDCD8 Instructions
Use the Expression builder to create a Calculated field.
Use the
CONCAT()
functionValue 1: “Week of” or any other string (prefix) the customer might require
Value2:
Add the
TOSTRING()
functionValue:
FORMAT DATE()
functionDate: “Resolved” Jira field value
Pattern:
dd/MM
or any other date formatting pattern
This example