Durations report
The SLA Durations report helps you analyze SLA duration data using bar or line charts and a detailed summary table. Configure the report to compare SLA durations over time and choose how the data is displayed.
How to create a Durations report
Navigate to SLA Reports.
From the Generate new report, click Duration.
Report configuration options
Filter your work items:
Use Project, JQL, or Issue Filters to refine the work items included in your report. When you select one, a new dropdown appears.
If you select Issue Filters, you can also apply Jira's built-in parameters or a previously saved work item filter.
Leave the filter type blank to include all work items.
Select the SLAs:
Choose the SLAs you want to include in the report. The list displays all SLAs, both enabled and disabled.
Leave the field blank to include all SLAs.
Click Chart Interval to set a time period for your report. Options include Custom, Last Month, Past One Month, and more.
Use the + More button to tailor the report to your needs.
For example, you can choose to display only the SLAs that are in the critical zone, or to show only the SLAs with an end date within a specific date range. You can add as many parameters as you'd like.
Chart configuration options
Choose your chart type: Line or Bar.
Determine what to display on the X-Axis (SLA Start Time, SLA End Time, SLA Deadline).
Select the unit for your Y-Axis (Days, Hours, Minutes, Seconds).
Select whether the data will be displayed Monthly or Weekly.
Click Generate to create your report.
To generate the report automatically on a schedule, click the chevron next to Generate, then select Schedule periodic report. Configure the schedule, recipients, and other subscription settings, then save the subscription.
Once generated, scheduled reports are available on the Periodic Reports page. Recipients receive an email notification when the report is ready.
Scheduled Durations reports contain the report’s summary-table data. The chart itself is not included.
Examples
Line chart
Bar chart
SLA Deadline visualization
Impact of Y-Axis format on chart visualization
Below are two examples showing how the Y-Axis format impacts the visualization:
The only difference between the two screenshots is that the duration format of the Y-Axis was changed from Days to Hours. Notice how a single change in the SLA value format alters the chart's presentation.
Export the report
Using the button on the right-hand side, you can download your report as an XLSX or PDF file. Once you click the button, the download will start automatically.