BigGantt Migration Issues: Workaround and Permanent Solutions for Jira Cloud Migration Assistant
This article addresses a critical issue where the BigGantt - Gantt Chart for Jira migration via Jira Cloud Migration Assistant (JCMA) fails at 99%. The failure is typically caused by a high volume of ID mappings that cannot be fully downloaded within the 15-minute transfer window imposed by the JCMA process. This article covers two scenarios: a manual workaround involving JCMA Dump manipulation and a permanent solution via an app upgrade. It also provides guidance for cases where the standard upgrade does not resolve the issue.
Scenario 1: Migration Fails Due to ID Mapping Timeout (Workaround)
Problem / Context
During the migration process, the app has a limited time window (15 minutes) to fetch all ID mapping data. This window is tied to the time it takes to transfer the BigGantt app data (JCMA Dump) from the Server/Data Center to the Cloud. If the volume of mappings is large, the download may not complete before the window closes, resulting in a failure at 99%.
Error Message in Logs:
"INFO","2026-06-06T12:13:44.436Z","Migration failed with reason: It looks like the JCMA Dump or ID mappings download couldn't be completed. Please contact our Support for assistance."Stack Trace Snippet:
com.softwareplant.util.rest.client.parallel.ParallelFetcherResultIncompleteException: Result of parallel fetching is incomplete, number of requests failed: 1
at com.softwareplant.util.rest.client.parallel.ParallelFetcherResult.getFetchedOrThrowIfIncomplete(ParallelFetcherResult.java:20)Cause
The open transfer window for fetching ID mappings closes as soon as the Cloud side confirms receipt of the app data. For large datasets, the default transfer time is too short to allow all mappings to be retrieved.
Solution / Workaround
To extend the transfer window, you can artificially increase the size of the JCMA Dump file. A larger file takes longer to transfer, thereby keeping the ID mapping window open for a longer duration.
Step-by-Step Instructions:
Download the JCMA Dump: Locate the current JCMA Dump file.
Extract the Archive: The file is a regular ZIP archive. Extract it to a folder.
Increase File Size:
Locate the
activeobjects.xmlfile within the extracted folder.Create approximately 8–9 additional copies of this file within the same folder to increase the total size.
Re-archive the Folder:
Create a new ZIP archive containing all files, including the new duplicates.
Important: Ensure you include all hidden files (e.g., files named similarly to
.f8234f47-f94f-4f61-8c4f-cf5368847775).The final archive should be approximately 1 GB in size.
Upload as Snapshot: Upload this new large archive as a snapshot in your BigGantt app. It will appear in your database dumps list with the same name as the original but without a JCMA Migration Name.
Database Update: You must update the database to point the migration to this new snapshot.
Run the following queries to identify the correct records:
SELECT * FROM "AO_8AC478_SYS_JCMA_SNAPSHOT";
SELECT * FROM "AO_8AC478_SYS_DB_ST_SNAPSHOT";Contact Support with the results of these queries to receive the specific
UPDATESQL command required for your environment.
Restart Migration: Once the database is updated, run the BigGantt migration again. The increased transfer time should allow all ID mappings to download successfully.
Scenario 2: Permanent Fix via App Upgrade
Problem / Context
The manual workaround in Scenario 1 is complex and requires direct database manipulation. A permanent fix has been implemented to optimize the ID mapping fetch process, making it significantly faster and avoiding the timeout issue.
Solution
Upgrade your BigGantt / BigPicture Data Center instance to a version that includes the optimized migration logic.
Recommended Versions:
BigPicture 8.70.11.1 – Compatible with Jira 11.
BigPicture 8.70.1.2 – Compatible with Jira 9.12.0 through 10.7.4.
Implementation:
Download: Obtain the latest version from the https://marketplace.atlassian.com/apps/1212259/bigpicture-portfolio-resource-management-for-jira/version-history?versionHistoryHosting=dataCenter.
Review Guide: Before upgrading, review the Installation and updates.
Upgrade: Apply the update to your Data Center environment.
Migrate: Run the migration via JCMA. The process should now complete successfully without the need for the JCMA Dump workaround.
Further Assistance
If the migration still fails at 99% after upgrading to the recommended versions, the volume of data may require additional tuning. In this case, please reach out to Appfire Support to request a dedicated .jar file and further instructions tailored to your environment.