Objective's lifecycle
Objective definition
An objective is a high-level analogy to work that needs to be done in a given period. They are a short summary highlighting what needs to be achieved but do not determine the way it should be done.
Such an approach provides more flexibility and team empowerment and allows you to focus on transparent, specific objectives at the same time.
Right-click pop-up menu
Right-click on an existing objective to see a list of available operations:
Objective statuses
The objective can have one of the following statuses, which you can update manually by right-clicking on the objective or by dragging the progress slide bar.
The list of possible statuses is outlined in the table below:
Objective status | Description |
---|---|
Open | The default status of a new objective.
|
Completed | The objective was completed and will not be moved to the next box.
|
Failed | The objective was not completed. It can be copied to the next Box (continued) or failed and left where it currently is.
|
Abandoned | The objective was not completed and will not be moved to the next box. |
Continue | The objective will be continued in the next box. |
Uncommitted objective | An additional objective with variable value (if time permits).
|
When achieving an objective takes more than a single iteration you can:
select
Continue
... option oruse drag and drop holding left
Alt
key.
Open Objectives - updating progress
The progress bar can be updated using inline editing - click (left mouse button) on the percentage number and enter a new value.
Manual change of objective status
When a Box is "Closed", objectives are in a read-only mode:
Objectives can't be added
Objectives can't be modified
Method 1:
Right-click on an objective. Select an option from the pop-up menu:
Method 2:
Double-click on an objective (left mouse button). A details box will appear:
Objective status set to Failed
When you set the Objective status to "Failed" the following pop-up will appear:
Keep in current Box (use this option if you don't intend to continue working on an objective. The Objective won't be moved or copied - status set to "Failed")
Continue (use this option if you intend to continue working on the objective. The objective is copied to the next Box - status set to "Open")
Automatic change of status
Progress based transition
When an Open objective progress reaches 100% Objective status is automatically changed to Complete.
When the progress bar is at 100% and you lower it, the status is changed to Open.
Box status transition to Closed
When you change the status of a Timebox to Closed and at least one of the objectives is marked as Open, you will see a dialog with possible actions:
Mark open objectives as "Failed" and continue
Mark open objectives as "Abandoned"
Do not modify the status of open objectives
Achievement Progress
The Achievement of Objectives feature will help you track the progress of your Goals and Objectives as well as calculate the planned vs actual business value metric.
Affected by
Box status
After a Box status is set to Closed you can't:
change the objective status
modify the progress of "Open" objectives
change the type (regular/uncommitted)
change the color
In Closed Boxes, you still can:
Change objective details (name and note)
Add and remove associated work
change the Objective's owner