Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

👋 Welcome to Planning Poker for Jira!

Top-rated Planning Poker app that facilitates agile team discussion aimed at reaching accurate and consensus-based estimations. Thanks to native Jira integration, teams can easily select game backlog, invite participants, view and edit issue details and comments during the poker session, and save their estimates for the selected Jira fields.

Appanvil karma designer
summary Improved estimation accuracy Facilitate discussion and help maintain a balance between the speed of the estimation process and the expected accuracy that all Agile teams strive for. It's now possible with reference and historical issues. Distributed but together The app is ideal for distributed Agile teams that cannot meet in one place for planning sessions - teams can get together to estimate their product backlog and make sure they reach consensus during an interactive Planning Poker game. Top notch estimation tools Planning Poker helps organize teams to ensure that estimates are as accurate as possible, properly manage scope, and deliver results to clients by encouraging group discussion and collaboration to reach the estimated consensus.
page{"premium":true,"name":"page","children":[{"id":"zDCRFIYi_A9w1-ewOgE4t","params":{"background":"#ffffff","padding":1,"gap":10},"children":[{"id":"fXhZaq9Z_YpdGmT5zZpiH","name":"row","children":[{"id":"30AoD2KfwGJ-rbFDM34aP","name":"column","children":[{"name":"card","templateId":"white with image and padding","params":{"gap":20,"padding":14,"borderRadius":{"all":10,"isIndividualCorners":false,"bbl":0,"bbr":0,"btl":0,"btr":0},"background":"#ffffff","hover":"elevate","boxShadows":[{"y":0,"blur":6,"spread":-1,"color":"#00000019"},{"y":2,"blur":4,"spread":-2,"color":"#00000019"}],"isMediaFullSize":false},"children":[{"name":"image","params":{"alignment":"center","position":"center center","borderRadius":{"all":6,"bbl":0,"bbr":0,"btl":0,"btr":0,"isIndividualCorners":false},"image":{"value":"att463635869","target":"_blank","type":"attachment"},"height":100,"width":105},"children":[],"id":"C7zEN-hhOClFZhxhA4k7g"},{"name":"text","params":{"value":[{"type":"paragraph","children":[{"type":"paragraph","children":[{"text":"Improved estimation accuracy","fontFamily":"Montserrat, sans-serif","fontWeight":700,"color":"#202022","fontSize":16}],"align":"left"}]}]},"children":[],"id":"mDVVdwnx-22bQ_zp6e08o"},{"name":"text","params":{"value":[{"type":"paragraph","children":[{"type":"paragraph","children":[{"text":"Facilitate discussion and help maintain a balance between the speed of the estimation process and the expected accuracy that all Agile teams strive for. It's now possible with reference and historical issues.","fontSize":14,"lineHeight":"22px","fontFamily":"Open Sans, sans-serif","color":"#6e6d6d"}],"align":"left"}]}]},"children":[],"id":"Ht3ovLIZzJZhD8nZ1yvPE"}],"id":"m8cCM_T1lm5Vubo_6al_I"}],"params":{"borderRadius":{"all":0,"btl":0,"bbl":0,"btr":0,"bbr":0,"isIndividualCorners":false},"padding":0,"gap":20,"verticalAlignment":"top"}},{"id":"2xFxDf9hZGCozNz3O5tie","name":"column","children":[{"name":"card","templateId":"white with image and padding","params":{"gap":20,"padding":14,"borderRadius":{"all":10,"isIndividualCorners":false,"bbl":0,"bbr":0,"btl":0,"btr":0},"background":"#ffffff","hover":"elevate","boxShadows":[{"y":0,"blur":6,"spread":-1,"color":"#00000019"},{"y":2,"blur":4,"spread":-2,"color":"#00000019"}]},"children":[{"name":"image","params":{"alignment":"center","position":"center center","borderRadius":{"all":6,"bbl":0,"bbr":0,"btl":0,"btr":0,"isIndividualCorners":false},"image":{"value":"att463471531","target":"_blank","type":"attachment"},"height":99,"width":105},"children":[],"id":"Vs_H_EF6_kmCND64REpq_"},{"name":"text","params":{"value":[{"type":"paragraph","children":[{"type":"paragraph","children":[{"text":"Distributed but together","fontFamily":"Montserrat, sans-serif","fontWeight":700,"color":"#202022","fontSize":16}],"align":"left"}]}]},"children":[],"id":"kY4OblGrIaxYwlU9AeZmB"},{"name":"text","params":{"value":[{"type":"paragraph","children":[{"type":"paragraph","children":[{"text":"","fontSize":14,"lineHeight":"22px","fontFamily":"Open Sans, sans-serif","color":"#6E6D6D"}],"align":"left"},{"type":"paragraph","align":"left","children":[{"fontSize":14,"lineHeight":"22px","fontFamily":"Open Sans, sans-serif","color":"#6E6D6D","text":"The app is ideal for distributed Agile teams that cannot meet in one place for planning sessions - teams can get together to estimate their product backlog and make sure they reach consensus during an interactive Planning Poker game."}]},{"type":"paragraph","align":"left","children":[{"fontSize":14,"lineHeight":"22px","fontFamily":"Open Sans, sans-serif","color":"#818181","text":""}]}]}]},"children":[],"id":"HwIg6AEz6PIqtW2kP-PJj"}],"id":"Y4dyOvW59Fr1PHOcz3LAd"}],"params":{"borderRadius":{"all":0,"btl":0,"bbl":0,"btr":0,"bbr":0,"isIndividualCorners":false},"padding":0,"gap":20,"verticalAlignment":"top"}},{"id":"GzZS5_Xs9SwLhkRT8R-Jj","name":"column","children":[{"name":"card","templateId":"white with image and padding","params":{"gap":20,"padding":14,"borderRadius":{"all":10,"isIndividualCorners":false,"bbl":0,"bbr":0,"btl":0,"btr":0},"background":"#ffffff","hover":"elevate","boxShadows":[{"y":0,"blur":6,"spread":-1,"color":"#00000019"},{"y":2,"blur":4,"spread":-2,"color":"#00000019"}]},"children":[{"name":"image","params":{"alignment":"center","position":"center center","borderRadius":{"all":6,"bbl":0,"bbr":0,"btl":0,"btr":0,"isIndividualCorners":false},"image":{"value":"att463570219","target":"_blank","type":"attachment"},"height":100,"width":105},"children":[],"id":"VupG2M2qbEB_ucPF5UhLX"},{"name":"text","params":{"value":[{"type":"paragraph","children":[{"type":"paragraph","children":[{"text":"Top notch estimation tools","fontFamily":"Montserrat, sans-serif","fontWeight":700,"color":"#202022","fontSize":16}],"align":"left"}]}]},"children":[],"id":"-xLYvqQiO72MDAb_ybPiy"},{"name":"text","params":{"value":[{"type":"paragraph","children":[{"type":"paragraph","children":[{"text":"Planning Poker helps organize teams to ensure that estimates are as accurate as possible, properly manage scope, and deliver results to clients by encouraging group discussion and collaboration to reach the estimated consensus.","fontSize":14,"lineHeight":"22px","fontFamily":"Open Sans, sans-serif","color":"#6E6D6D"}],"align":"left"}]}]},"children":[],"id":"-v9zZleuKEKksIX1Kc8K6"}],"id":"H74OFxbaKWM7_Ma6HfCvL"}],"params":{"borderRadius":{"all":0,"btl":0,"bbl":0,"btr":0,"bbr":0,"isIndividualCorners":false},"padding":0,"gap":20,"verticalAlignment":"top"}},{"id":"r8AYiI6JRtt0-yaxKP2af","name":"column","children":[],"params":{"borderRadius":{"all":0,"btl":0,"bbl":0,"btr":0,"bbr":0,"isIndividualCorners":false},"padding":0,"gap":20,"verticalAlignment":"top"}},{"id":"qCqHCeBnvceyBTjCFf0DC","name":"column","children":[],"params":{"borderRadius":{"all":0,"btl":0,"bbl":0,"btr":0,"bbr":0,"isIndividualCorners":false},"padding":0,"gap":20,"verticalAlignment":"top"}},{"id":"IrtRcIpNHvSvc3AWxpHAt","name":"column","children":[],"params":{"borderRadius":{"all":0,"btl":0,"bbl":0,"btr":0,"bbr":0,"isIndividualCorners":false},"padding":0,"gap":20,"verticalAlignment":"top"}}],"params":{"layout":[1,1,1],"gap":20,"minHeight":100,"padding":5,"borderRadius":0,"size":"small"}}],"name":"section"}],"id":"SK_jc3s-_GRiwqh2cB5Tn"}

Panel
bgColor#DEEBFF
  • Seamless integration

  • Real-time estimation

  • Async mode

Panel
bgColor#DEEBFF
  • Intuitive game setup

  • Private, unbiased voting

Panel
bgColor#DEEBFF

Widget Connector
overlayyoutube
_templatecom/atlassian/confluence/extra/widgetconnector/templates/youtube.vm
width1000px
urlhttps://www.youtube.com/watch?v=WgTy3oUoEJk&t=91s&ab_channel=Appfire
height400px

Here is a quick overview of Planning Poker:

The app provides a set of tools to support teams during a consensus-based game, including an intuitive setup with advanced settings, reference issues, quick issue details and actions, and more.

How does the game work?

The general idea of Planning Poker is that after a period of discussion, each participant chooses from his own deck the numbered card that represents his estimate of how much work is involved in the story under discussion.

All estimates are kept private until each participant has chosen a card. Then all estimates are revealed, and discussion can begin again.

Image RemovedImage Added

This is all done inside the user’s Jira project. If you’re interested in trying out Planning Poker for Jira, check out this article to get instructions on how to install the app.