Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This article provides a workaround to restrict the timesheets at the project level by modifying the project permissions in Jira.

\uD83D\uDCD8 Instructions

Make sure to have Jira administrator permissions to perform the below steps:

  1. Navigate to the respective project, Project Settings > Permissions. Look for Work On Issue permissions and allow access only to a Single user or Jira administrator. This step will ensure no other user can log time apart from the user who has been granted permission.
    Note: Make sure the project permissions are associated with a single permission scheme specific to this project.

    Image RemovedImage Added
  2. Verify if the users are able to log time from My Timesheet or from the Jira issue view. The results are shown below

    Image RemovedImage Added

    Image Removed


    Image Added

Info
  • These steps are applicable to Cloud and Datacenter

.

...

  • .

...