After you have installed Agile Reports for JIRA, you can add its gadgets to your dashboard. This is a standard procedure and you can find plenty of details and First you need to add this report to your dashboard. To do that, click Add new gadget. In the Add new gadget dialog, click Load all gadgets. Search for the Release Prediction report and add it to your dashboard.
To see more instructions about adding a gadget to your dashboard in see Atlassian documentation.
Configuring Release Prediction Chart
To set Setting up the Release Prediction Chart is a quick and easy procedure, just fill out the chart configuration fields:necessary chart fields to select what you would like to see on your report:
Fields description
Field | Description | SCRUM Board | |||
---|---|---|---|---|---|
Display data for | You can build your report on a Jira project, SCRUM board, or a saved filter. Project If you select a Jira project, the report will show how the work is being delivered inside a particular project and will calculate work on the tickets belonging to the selected project only SCRUM board If you select a SCRUM board, the report will show how work is being delivered for a particular SCRUM team.
| sprint on the SCRUM board.
Saved filter This is the most flexible way to display data for the report. You can create any filter in Jira to display the tickets that you need, save it, and select for the report. Use this option for tailored Jira setups and if you are working in SAFe. | |||
Filter by | Additional filter. Note that the available options for the additional filtering depend on your main filter for the report, that is whether your report is built for a project, SCRUM board, or a saved filter. | ||||
Start reporting at | Start date for the report. This is a required field. | ||||
Backlog extra issues | The number of issues from the backlog that will be included in the report. The default number of issues is set to 0, which means that the report will process only the tickets that are included into the future sprints and ignore any tickets that are in the backlog. | ||||
Report cumulates | Time metrics for your report, measured in man-days (MD) or story points (SP). | ||||
Deviation lines at | User defined acceptable deviation from the plan, measured in % and can be between 10% and 90%. If you don't want to show view the deviation lines at the moment, just select "(Hide lines)" option from the select dropdown list. The chart will show the shows deviation lines based on the future Sprint estimates and the selected deviation. The selected deviation percent is applied to taken into account when calculating the projected release date and it results the optimistic release date , optimistic, and pessimistic release datedates. You can define what you consider to be a norm as a deviation % from sprints estimates. For example if you set the deviation to 30% and your projected release date is 4/02/2018 and your team is moving faster by 30% than it has been estimated then your release date should be 2/04/2018. If you allow your team to be 30% behind the schedule, your release date will be 5/28/2018. As long as a team is within the deviation norm, the team progress is considered to be on track, and you do not get warnings every time when the actuals line is below the estimates. Everything below the Deviation (late) line is considered to be in danger zone as this means that the work is behind the plan for more than an established deviation normyou can allow for. The danger zone is marked as a transparent red area below the Deviation (late) line. Thus, the main thing is not to let the actuals line get into the danger zone. | ||||
Refresh Interval | The interval at which you want the gadget to be updated updated. |
This is it! When you are done with the setup, click the Save button and a Release Prediction Chart will be displayed.
See also
RPC - Configuring Using Release Prediction Chart