Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This article explains how to add Script inline script task in a Bamboo Job job using Bamboo Command Line Interface (CLI).

Instructions

Use the addTask action to create inline script task tasks in the Bamboo job. Refer to the sample command below:

Code Block
themeMidnight
--action addTask --plan DEMO-NEW  --job "JOB1"  --taskKey SCRIPT --description "Scripted Task " --field scriptLocation=INLINE --field scriptBody="exit -1"

In the above action:

  • --plan value refers to a Bamboo plan key.
  • --job value refers to the Bamboo job key.
  • --taskKey value refers to Bamboo task type.
  • --description value refers to task description.
  • --field parameter refers to specific script configuation.
    • --field  scriptLocation=INLINE refers to  inline script type.
    • --field scriptBody="exit -1" refers body of INLINE scripts and " \n " used new lines
  • Additionally, --disable parameter can be used to disable the task and --final parameter to script task as a final task.


Info

It is recommended to test it in a non-production environment or run the action with --simulate parameter to verify the behavior before deploying.

...