Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Azure is more restrictive than Jira when it comes to linking between work items, thus it’s not always possible to synchronize some links from Jira to Azure. We synchronize links in a sorted manner (starting with those having smaller ID). 

This behaviour behavior means that when two links cannot exist with each other on the same work item in Azure we are only going to synchronize one with a lower id.


Example

opposite Opposite links in Jira are allowed to point to the same work item from one work item (for instance in default Jira configuration, A can be blocked by B and A can blocks B).

...