Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Since Starting with Power Scripts for JIRA 4.0 (formerly known as JJUPIN) you Jira v4.0 you can configure scripts to run at the start of your plugin (startup script) or at its end (shutdown script). The scripts are run every time Since Power Scripts for JIRA gets because Power Scripts gets started/stopped, and this is usually either for administrative reasons (i.e. update of the plugin) or at JIRAJira's own startup/shutdown.

You can configure both of them from Administration → on the Administration > Start/Stop Scripts page.

Image RemovedImage Added